Potable water treatment project of capacity of 500 m3/hr comprising of two units each 250 m3/hr including piping network

 It was agreed upon between SIEI and medicine city to supply, install and operate the said project according to Baghdad mayoralty authority ay rehabilitation and development letter no 8143 rated 10th /dec./2006.

According to letter ay intent no 176030 18th /dec./2006. SIEI started working on site ,by all means and capacity wing all staff of engineers & technicians to comply to measurement agreed upon .and according to international standards ,supplying the required machinery equipment , and piping from western origins , which consist of sedimentation reservoirs , treatment systems , hydro form systems ,and accessories , installing directly every part , connecting of piping, including suction pipes, delivery pipes, transporting pipes, connecting them to Baghdad  hospital , and to special surgery hospital , executing all other accessory works related to the project , like floating, bridge over river , building three main rooms , fence and a main gate.

In addition to , potable water produced is under daily exam looking for clearness and anti pollution SIEI with stands it position ready for warrant and main tenancy ay project for a can plate year from day ay lineal acceptance .

Rehabilitation of specialized surgical hospital project in the city of medicine: --

         City of Medicine was founded in 1967 in Baghdad and the city's largest hospital in the Middle East, for time being by then in view of the enormous numbers of patients receiving treatment and services consumed by a lot of facilities such as building specialized hospital surgery as well as elevators, a (9 lifts) in a hospital surgery and (4 elevators) of the Hospital private nursing home (1 elevator) to manage the hospital and (2 elevator) for the accommodation of the doctors and (2 elevator) in the laboratory and (4 elevators) to a Baghdad hospital.
        A contract has been signed between the Department of Medicine City Hospital and SIEI to rehabilitate the building, as follows: --
1 - elevators: --
A - install elevators in (4no. off. hospital.
B – Rehabilitation of  (18) elevator in each of the following locations: --
(Hospital, surgery (9), nursing home (4), in the building of administration (1), and in the doctors housing (2), and the number of laboratories (2))
      2 - rehabilitation of all floors in terms of civil works, healthy rooms and corridors, including bathrooms, laundries, sewage and false ceilings.
    3 - Mechanical works: --
   rehabilitation of (
exhausting fans, air compressors, pumps, water heaters, air washers).

Division of the elevators: --

 
Ministry of Water Resources: --

Processing and set up and operation of elevators number (2) in contract dated 24/9/2007 for a period of (10) months have been completed and the mechanical work in progress to complete the electrical work and achievement by a ratio of 75%.

 
The Ministry of Oil: --

Rehabilitation (7) Elevator in contract dated 17/11/2007 for a period of (4) months with the rehabilitation of all elevators have been received by the Ministry and by a ratio of 92% achievement.

Ministry of Higher Education: --

Dismantle and set up and operation (3) elevators in the contract dated9/9/2008 for a period  (10) months has been taking the measurement of all shafts .

Iraqi Airways: --

Processing and set up and operation (4) elevators in the contract for a period of 23/3/2008 (6) months, with the dismantling of (4) by the elevators, the ratio of 20% achievement.

Medical City Hospital: --

Rehabilitation (17) elevator in a specialized hospital surgery (4) elevators at a Baghdad educational hospital in the contract dated 8/8/2005 for a period of (283)days was complete rehabilitation of (17) elevator and was received preliminary, and (4) elevators in Baghdad hospital has been delivered and is now part of the maintenance period and thus the proportion of 90% achievement.

Ministry of Communications: --

Rehabilitation and maintenance (4) elevators in the contract dated 17/7/2008 for one month period , the rehabilitation and maintenance done by the completion of 91%.

Ministry of Justice: --

Dismantling and installing and operating (7) Elevator in contract dated 5/6/2005 for a period (9.5) months with an end to all acts of the elevator was delivered (7) received preliminary.
.

 

 

 