Potable water treatment
project of capacity of 500 m3/hr comprising of two units
each 250 m3/hr including piping network
It
was agreed upon between SIEI and medicine city to
supply, install and operate the said project according
to Baghdad mayoralty authority ay rehabilitation and
development letter no 8143 rated 10th /dec./2006.
According to letter ay intent no 176030 18th
/dec./2006. SIEI started working on site ,by all means
and capacity wing all staff of engineers & technicians
to comply to measurement agreed upon .and according to
international standards ,supplying the required
machinery equipment , and piping from western origins ,
which consist of sedimentation reservoirs , treatment
systems , hydro form systems ,and accessories ,
installing directly every part , connecting of piping,
including suction pipes, delivery pipes, transporting
pipes, connecting them to Baghdad hospital , and to
special surgery hospital , executing all other accessory
works related to the project , like floating, bridge
over river , building three main rooms , fence and a
main gate.
In addition to , potable water produced is under daily
exam looking for clearness and anti pollution SIEI with
stands it position ready for warrant and main tenancy ay
project for a can plate year from day ay lineal
acceptance .
Rehabilitation of specialized surgical hospital project
in the city of medicine: --
City of Medicine was founded in 1967 in Baghdad
and the city's largest hospital in the Middle East, for
time being by then in view of the enormous numbers of
patients receiving treatment and services consumed by a
lot of facilities such as building specialized hospital
surgery as well as elevators, a (9 lifts) in a hospital
surgery and (4 elevators) of the Hospital private
nursing home (1 elevator) to manage the hospital and (2
elevator) for the accommodation of the doctors and (2
elevator) in the laboratory and (4 elevators) to a
Baghdad hospital.
A contract has been signed between the
Department of Medicine City Hospital and SIEI to
rehabilitate the building, as follows: --
1 - elevators: --
A - install elevators in (4no. off. hospital.
B – Rehabilitation of (18) elevator in each of the
following locations: --
(Hospital, surgery (9), nursing home (4), in the
building of administration (1), and in the doctors
housing (2), and the number of laboratories (2))
2 - rehabilitation of all floors in terms of civil
works, healthy rooms and corridors, including bathrooms,
laundries, sewage and false ceilings.
3 - Mechanical works: --
rehabilitation of (exhausting fans,
air compressors, pumps, water heaters, air washers).
Division of the elevators: --
Ministry of Water Resources: --
Processing and set up and operation of elevators number
(2) in contract dated 24/9/2007 for a period of (10)
months have been completed and the mechanical work in
progress to complete the electrical work and achievement
by a ratio of 75%.
The Ministry of Oil: --
Rehabilitation (7) Elevator in contract dated 17/11/2007
for a period of (4) months with the rehabilitation of
all elevators have been received by the Ministry and by
a ratio of 92% achievement.
Ministry of Higher Education: --
Dismantle and set up and operation (3) elevators in the
contract dated9/9/2008 for a period (10) months has
been taking the measurement of all shafts .
Iraqi Airways: --
Processing and set up and operation (4) elevators in the
contract for a period of 23/3/2008 (6) months, with the
dismantling of (4) by the elevators, the ratio of 20%
achievement.
Medical City Hospital: --
Rehabilitation (17) elevator in a specialized hospital
surgery (4) elevators at a Baghdad educational hospital
in the contract dated 8/8/2005 for a period of (283)days
was complete rehabilitation of (17) elevator and was
received preliminary, and (4) elevators in Baghdad
hospital has been delivered and is now part of the
maintenance period and thus the proportion of 90%
achievement.
Ministry of Communications: --
Rehabilitation and maintenance (4) elevators in the
contract dated 17/7/2008 for one month period , the
rehabilitation and maintenance done by the completion of
91%.
Ministry of Justice: --
Dismantling and installing and operating (7) Elevator in
contract dated 5/6/2005 for a period (9.5) months with
an end to all acts of the elevator was delivered (7)
received preliminary..
|